North-West T-way
| North-West T-way | |
|---|---|
| Overview | |
| Operator | Busways Hillsbus |
| Began service | March 10, 2007 (2007-03-10) |
| Route | |
| Start | Blacktown Station Rouse Hill Station |
| Via | Norwest Business Park Westmead Hospital |
| End | Parramatta Station |
| Length | 24 km |
The North-West T-way is a continuous series of bus-only lanes and bus roadways between Parramatta, Blacktown and Rouse Hill in Western Sydney. Opened in stages between March and November 2007, the 24 km (14.9 mi) T-way was the second bus rapid transit route to be built in Sydney after the Liverpool–Parramatta T-way.
Contents
1 Alignment
2 Construction
3 Stations
4 Services
5 Criticisms
6 References
7 External links
Alignment
The T-way follows Old Windsor Road north from Westmead Hospital. At Memorial Avenue, Kellyville, the route branches, with one branch continuing north along Old Windsor and Windsor roads to Rouse Hill Town Centre and the other heading west along Sunnyholt Road to Blacktown.
The alignment includes 10 new bridges and two new underpasses. Three of the T-way's 24 route-kilometres are bus lanes on existing roads.[1]
The Bella Vista–Rouse Hill section of the T-way runs parallel with the Sydney Metro Northwest rail line.
Construction
The NSW Government announced the T-way network as part of its Action for Transport plan in 1998. The North-West project was approved in February 2004 and was jointly overseen by the then Ministry of Transport and Roads and Traffic Authority. The $323 million design–build–maintain contract was awarded to Leighton and construction began in mid 2005.[2][3] Construction took place alongside a major upgrade and widening program on Windsor and Old Windsor roads, known as 'All the way to Windsor'.[4]
The design was said to avoid many of the mistakes that had made the earlier Liverpool–Parramatta T-way so expensive to build.[5]
The T-way opened in three stages:[6]
- Parramatta to Merriville Road, Rouse Hill – 10 March 2007
- Merriville Road to Rouse Hill Town Centre – 25 September 2007
- Blacktown branch – 4 November 2007.
A fourth section, continuing from the Blacktown branch and between Burns Interchange to Castle Hill, was never constructed.
Stations
Norbik T-way station
The North-West T-way has 30 stations, spaced approximately every 800 metres. Stations feature closed circuit television, real-time information screens, emergency help points, audio announcements and extensive landscaping.[7]
One station, Parramatta Station, also forms part of the Liverpool–Parramatta T-way. The other stations are, from Parramatta:
Westmead, at Westmead Station
Hospital, at Westmead Hospital
Mons, at Mons Road, Westmead
Briens, at Briens Road, Northmead
- Constitution Hill
Fitzwilliam, near Fitzwilliam Road, Constitution Hill
Johnstons, near Johnstons Bridge, Old Toongabbie
Powers, near Powers Road, Seven Hills
Abbott, near Abbott Road (Prospect Highway), Seven Hills
Joseph Banks, near Joseph Banks Drive, Kings Langley
Troubador, near Troubador Park, Kings Langley
Norbrik, near Norbrik Drive, Glenwood
Meurants, near Meurants Lane, Glenwood
Celebration, near Celebration Drive, Bella Vista
Burns, near Memorial Avenue (formerly Burns Road), Kellyville
From Burns, the Blacktown branch proceeds to:
Stanhope, near Stanhope Parkway, Glenwood
Sorrento, near Sorrento Drive, Glenwood
Wilson, near Wilson Road, Glenwood
James Cook, near James Cook Drive, Kings Langley
Vardys, near Vardys Road, Blacktown
Turner, near Turner Street, Blacktown
Bessemer, near Bessemer Street, Blacktown
Sackville, near Sackville Street, Blacktown
Devitt, near Devitt Street, Blacktown
Blacktown, at Blacktown Station.
From Burns, the Rouse Hill branch proceeds to:
Riley, near Samantha Riley Drive, Kellyville
Merriville, near Merriville Road, Rouse Hill
Sanctuary, near Sanctuary Drive, Rouse Hill
Rouse Hill, at Rouse Hill Town Centre.
Services
Busways and Hillsbus operate North-West T-way services. There are many services which traverse the T-Way, either in its entirety or a section of it. The route numbering follows the Sydney Metropolitan Bus Route Numbering System with T-way specific routes prefixed with T. (Hillsbus T6x and Busways T7x)
The following T services use the Parramatta - Rouse Hill T-Way
T65 Hillsbus
T60 Parramatta - Castle Hill via Crestwood
T61 Parramatta - Blacktown via Kings Langley
T62 Parramatta - Castle Hill via Bella Vista and Tuckwell Road
T63 Parramatta - Rouse Hill Town Centre via Glenwood and Stanhope Gardens
T64 Parramatta - Rouse Hill Town Centre via Norwest Business Park and Kellyville
T65 Parramatta - Rouse Hill Town Centre
T66 Parramatta - Rouse Hill via Rouse Hill Town Centre
T71 Blacktown - Castle Hill via Stanhope Gardens, Rouse Hill Town Centre and Kellyville
T75 Blacktown - Riverstone via Rouse Hill
The following T services use the Blacktown - Parklea T-Way
T61 Blacktown - Parramatta via Kings Langley
T70 Blacktown - Castle Hill via Glenwood and Norwest Business Park
T71 Blacktown - Castle Hill via Stanhope Gardens, Rouse Hill Town Centre and Kellyville
T72 Blacktown - Quakers Hill via Pye Road
T74 Blacktown - Riverstone via Stanhope Gardens and The Ponds
T75 Blacktown - Riverstone via Rouse Hill
Hillsbus and Busways also operate other routes along the T-way.
Criticisms
The T-way and its operations has come under criticism in several areas. Even before its opening, the Roads and Traffic Authority was criticised for its lack of planning and broken promises on the T-way's construction. Parramatta Council complained during construction that noise walls had not been built next to the homes of residents who lived along the T-way route, causing them distress. The planned cycleway alongside the T-way was not built in its entire length, and included a large deviation which Council complained would erode the cycleway's effectiveness.[8] After the opening of the first stage of the T-way, a local cycle advocacy group identified a large gap in the cycleway, potentially compromising cyclists' safety.[9] Some local residents had their backyards destroyed.[10]
On the opening of the initial route several other problems were raised. Comments were made concerning the initial patronage of the T-way. While the New South Wales State Government refused to say how many people used the T-way in its first week, a local newspaper discovered that the commuter carpark attracted as few as ten cars a day in the first week of operation.[11] Another local newspaper reported a traffic barrier separating vehicles from the busway at Westmead railway station was causing accidents.[12]
On 12 April 2007, the Roads and Traffic Authority quietly scrapped the bus priority system that would have given buses priority at all at-grade intersections. The decision was criticised as eliminating the main advantage of the T-way and not entice commuters back to public transport.[13] Bus operators expected better patronage once the toll on the Lane Cove Tunnel came into effect.[14]
References
^ Leighton Holdings A$323 million contract
^ T-way, Leighton
^ North West Bus Transitway, Leighton
^ Ozroads. "Old Windsor and Windsor roads"..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output q{quotes:"""""""'""'"}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}
^ Baker, Jordan (25 August 2006). "Transport's vision splendid running at only half capacity". The Sydney Morning Herald.
^ ComfortDelGro Cabcharge, Hillsbus Service Update: Routes T63, T64, T65 and 610", 25 September 2007. Accessed 26 September 2007.
^ Jordan Baker (2006-08-25). "Transport's vision splendid running at only half capacity". Sydney Morning Herald. Retrieved 2007-01-04.
^ City of Parramatta, "News: RTA urged to reconsider noise walls and cycleway route", 11 November 2005. Accessed 16 April 2007.
^ "CAMWEST: North-West T-Way: From Abbott Road to Wentworthville", 20 March 2007. Accessed 16 April 2007.
^ Soon, Nick, "T-Way Nightmare", Blacktown City Sun, 14 March 2007. Accessed 16 April 2007.
^ Campise, Kirsten, "Commuters Ignoring T-Way", The Northern News, 28 March 2007. Accessed 16 April 2007.
^ Stevens, Kylie, "Barrier a 'hazard'", Parramatta Sun, 28 March 2007. Accessed 16 April 2007.
^ Besser, Linton, "Priority bus green lights scrapped", Sydney Morning Herald, 12 April 2007. Accessed 16 April 2007.
^ Baker, Jordan, "New tunnel sums: 17 minutes less, $25 more in toll", Sydney Morning Herald, 23 March 2007. Accessed 16 April 2007.
External links
- transportnsw.info: public transport timetable and fare information
- Busways maps and timetables
- Hillsbus maps and timetables